Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Abdelaty, A F A (2017) Data-driven algorithms for enhanced transportation infrastructure asset management, Unpublished PhD Thesis, , Iowa State University.

Al Shalabi, F A (2016) BIM framework for energy and maintenance performance assessment for facility management, Unpublished PhD Thesis, , Iowa State University.

AlBughdadi, A J M (2022) Advanced decision support tools for bridge asset management, Unpublished PhD Thesis, , Iowa State University.

  • Type: Thesis
  • Keywords: decision support; highway; replacement; asset management; bridge management; decision making; deterioration; forecasting; network analysis; social network analysis; bridge
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/2715827284
  • Abstract:
    Bridge management includes bridge maintenance, operation, replacement, preservation and improvement with a focus on making informative and effective decisions for these activities. The dissertation includes three studies related to bridge management to support decision making. This dissertation includes an overview of transportation asset management and highlights on bridges condition status in the US. It further provides an overview on the major acts and laws signed into law that involves the use of transportation asset management plans. The dissertation also includes a brief timeline of bridge management in addition to a brief discussion on the use of bridge management systems. The first paper included in this dissertation focuses on exploring the use of Social Network Analysis in measuring bridges’ importance relative to each other and ranking them accordingly. Findings from this study indicated that including bridge connectivity using social network analysis measures has a promising potential in establishing a more comprehensive prioritization system for bridges that incorporates transportation system needs when applied on the bridges on the base highway network (BHN) of the National Highway System (NHS) in Iowa (BHN-NHS). The second paper involved developing a data-driven framework that focuses on selecting variables that would potentially have higher impact over bridge deck time in lower condition ratings and provide more accurate life forecasting models for them. Findings supports that clustering bridges based on impacting factors could help refine forecasting models. This dissertation also conducted a survey to identify guidance needs for the implementation and customization of an analytical software widely licensed across state agencies and offered an approach to be used as an initial step in calculating transition periods for the general condition ratings (GCR) deterioration profile module.

Azmy, N (2012) The role of team effectiveness in construction project teams and project performance, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Barutha, P J (2018) Integrated project delivery for industrial projects, Unpublished PhD Thesis, , Iowa State University.

Canales Fernandez, A R (2004) Developing effective integration between American supervisors and hispanic craft workers in construction, Unpublished PhD Thesis, , Iowa State University.

Christensen, A N (2019) Identifying private construction project owner inefficiencies that affect project goals, Unpublished PhD Thesis, , Iowa State University.

El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling, Unpublished PhD Thesis, , Iowa State University.

Elmisalami, T E (2001) Developing a multi-attribute utility model (MAUM) for selecting information technologies in the construction industry, Unpublished PhD Thesis, , Iowa State University.

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model, Unpublished PhD Thesis, , Iowa State University.

Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts, Unpublished PhD Thesis, , Iowa State University.

Gao, Z (2004) Investigation of technologies to improve the visualization of design documents and construction process, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control, Unpublished PhD Thesis, , Iowa State University.

Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Kawal, D E (1970) A systems model of a construction firm, Unpublished PhD Thesis, , Iowa State University.

Lueth, P L O (2008) The architectural design studio as a learning environment: A qualitative exploration of architecture design student learning experiences in design studios from first- through fourth-year, Unpublished PhD Thesis, , Iowa State University.

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML), Unpublished PhD Thesis, , Iowa State University.

McCann, M (1986) An application of convex programming to construction scheduling, Unpublished PhD Thesis, Industrial and Manufacturing Systems Engineering, Iowa State University.

Mohd Zainudin, N (2019) Identification and analysis of worker safety hazards in Midwest agribusiness construction work sites, Unpublished PhD Thesis, Agricultural and Biosystems Engineering, Iowa State University.

Nahvi, A (2019) Integrated stochastic economics performance evaluation of horizontal infrastructure systems, Unpublished PhD Thesis, , Iowa State University.

Pinto Nunez, M D C (2017) Comprehensive partnering management model for highway construction projects delivered using traditional and alternative methods, Unpublished PhD Thesis, , Iowa State University.

Rahbar, F (1997) Computer-aided parametric planning (CAPP), Unpublished PhD Thesis, , Iowa State University.

Rueda-Benavides, J A (2016) Indefinite delivery/indefinite quantity project selection framework using stochastic techniques, Unpublished PhD Thesis, , Iowa State University.

Shrestha, K P (2016) Data analytics and visualization for enhanced highway construction cost indexes and as-built schedules, Unpublished PhD Thesis, , Iowa State University.

Sirotiak, T L (2008) The effect of problem/project-based learning on a desired skill set for construction professionals, Unpublished PhD Thesis, , Iowa State University.

Smadi, O G (2000) Knowledge-based expert system pavement management optimization, Unpublished PhD Thesis, , Iowa State University.

Talbot, J (2021) Understanding housing reconstruction in Puerto Rico after hurricanes Irma and Maria, Unpublished PhD Thesis, , Iowa State University.

Tapia, R M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.

Woldesenbet, A (2014) Highway infrastructure data and information integration & assessment framework: a data-driven decision-making approach, Unpublished PhD Thesis, Civil, Construction, and Environmental Engineering, Iowa State University.